PROCESS DESCRIPTION
Step 1 - Raw-material received from market
Step 2 – Raw-material is inspected and the rejected goods
are sent back to the supplier.
Step 3 – Approved raw-material is then washed and chilled
in Chilled water tanks
Step 4 – Chilled goods are then graded according to different
size and weight.
Step 5 – Graded goods are washed and chilled in separate
tanks.
Step 6 – Graded goods are then sent to the packing area and
packed in trays
Step 8 – Trays are then set into trolleys which are set in
the Air-blast Freezer, which is set at – 40 C for six hours
Step 9 – The block is then set in to master cartons.
Step 10 – Master cartons are then stored in Cold Stores,
which is set at -18 to -20 C for later shipment to the buyers.
|